Castle Rock Industrial at the Meadows
Castle Rock Industrial at the Meadows is the first ever industrial project in Castle Rock and was built on a brand new development site without any utilities....
Read More →Bioscience 5 is the third building Saunders was contracted to complete as a result of a collaborative development effort between CU Anschutz and the Fitzsimons Redevelopment Authority.
This new flexible manufacturing space features office suites, research bays, clean rooms and wet labs to accommodate cell and gene therapy, chemistry, biology, GMP and medical device tenants. The building was planned as a high architecture tilt wall structure with high bay ceilings for flexible tenant use. Construction is taking place with no floor slab poured to keep the floor easily accessible for future utilities to specialized lab equipment to be run as tenants begin to occupy the building.
Renderings courtesy of MOA Architecture.